| Sponsored by: | |
![]() | ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | The Build Diary
|
||||
|
Module 1 Build:
<25th August 2005> Pedals:
The pedals were very straight forward, apart from not being able to find the M8 x 55mm long bolts needed to connect the pedals to the pedal mounts. I can't fit the master cylinder just yet as i have to rivet the front bulthead panel on first, this will hopefully be done some time today though.
|